Hi,

Is it possible to set what 1x CPU / 1x GB RAM costs? The reason I ask is we're looking at using Turbonomics to produce rightsizing reports for our customers. Therefore these reports would need to show the cost saving to them which is based on a rate card, rather than working out from the host of the infrastructure hosts behind it.

If not, is it possible to have a rightsizing report which doesn't even try to work out the cost savings as this column would be false information for them.